Cleary Building Corp | Pre-engineered Structures | Pole Barn
Built with PRIDE before the SHAMROCK is applied.Home

 

   
MODEL RES3 FLOOR PLAN RES3
Cleary Building Corp. | Model | Equine 3
Cleary Building Corp. | Floor Plan | Equine 3
Click on image for larger view Click on image for larger view
E-mail for Price
(tax & freight must be added based upon your location)
E-mail Cleary for final price with tax & freight
Accessories SECTION RES3
  • 8'-5" inside clearance from the 100' mark
  • Sidewall bay spacing 8' o.c. (6 bays)
  • 30 psf ground snow load design with 4/12 pitch
  • 8' x 24' Porch w/ vented aluminum soffit Ceiling
  • (2) 3' x 6'8" Series 20 Plyco walk doors w/ 6- panel and       deadbolt (White)
  • (8) 4' x 4' Series 500 windows
  • (1) 4' x 3' Series 500 windows
  • 12" Overhang on perimeter of building (vented soffit       match trim building color)
  • Full length profile ridge ventilation
  • Tyvek house wrap
  • Treated plank w/ filler strips
  • Cleary Building Corp. | Section | Equine 3

    Interior Wall Nailers, Ceiling Nailers, Ceiling Insulation, Vapor Retarder in Walls and Ceiling Finish, and Wall Finish NOT PROVIDED by Cleary Building Corp.
    Click on image for larger view
    Perimeter Foundation Insulation and Concrete Floor NOT PROVIDED by Cleary Building Corp.
    (Size and Depth to be determined by climate)
     


         ©2012 Cleary Building Corp.      Website Design by Tingalls Dzyn, LLC